Recent content

Practical Honda Click 125i notes on idle problems, Idling Stop and coolant checks, with official manual links and clear guidance on when to use a mechanic.

To detach a process started in the terminal, you can always add & at the end. For example: npm run evaluation &

Many times you need to download files from the internet, specifically when you want to automate a process or two.

A practical order for fixing WordPress PageSpeed problems: test the pages that matter, identify the real bottleneck, and verify improvements without chasing a score.

SoapUI is a smart and advanced open source tool to test APIs.

R-Project can be used to parse, build and validate XML files.

There are many tools and a lot of software out there to convert PDFs to Word.

Online tools like:

readlink -e /proc/$(xprop -id $(xdotool getactivewindow) _NET_WM_PID | awk '{print $3}')/cwd

This might be useful when your machine shuts down unexpectadly under heavy loads: http

Recovering overwritten description (

A practical WP-CLI guide for agencies and operations teams managing migrations, access fixes, plugin cleanup, and repeatable WordPress maintenance.

Fix MySQL zero-date import errors without weakening the whole server. Audit the data, use a session-only bridge, and plan a durable cleanup.

Install latest version of R-studio

In bash: R -e 'update.packages(checkBuilt = TRUE, ask = FALSE)'

I have an old external seagate ssd 2TB for backup called "BUP Slim BL".

Compare four distinct approaches to Ubuntu server operations—and choose the right mix for administration, recovery, hosting, and fleet governance.

A safer way to bulk-delete Cloudflare DNS records using the dashboard or API, with backups, approval checks, controlled execution, and validation.

A practical guide to choosing direct scraping, Playwright, Puppeteer, or R browser automation—and building workflows your team can maintain.

A practical guide to choosing, setting up, and scoping Drupal Commerce—covering architecture, catalog design, checkout, integrations, and launch risks.

A practical 2026 guide to auditing a legacy Drupal 9 site, using Drupal 10 as a controlled bridge, and deciding whether to upgrade to Drupal 11 or rebuild.